Location: Southeastern US
Inspected and made necessary repairs and modifications as required to 4 flood gates for a major power company in the Southeast. Work was accomplished by installing “stop logs” to create a temporary gate, upstream of the permanent floodgates, so that the latter could be inspected and repaired “in the dry”.