Call Us | 704-598-0818

PROJECTS

Alex Porter Dam
Hall Contracting
/ Categories: All, Heavy/Industrial

Alex Porter Dam

PROJECT:

Constructed a low risk dam for a private individual, including shaping the pond bottom.

Excavated approximately 6,800 cubic yards of material and constructed dam with approximately 14,800 cubic yards of clay.

Removed approximately 36,000 cubic yards of material during the pond shaping phase.

LOCATION:

Davidson, NC

Previous Project Chillowee Dam Sinkhole Repair Next Project Turbine Rebuild
Print
180

Theme picker

Login