Call Us | 704-598-0818

PROJECTS

Charlotte Douglas International Airport Reline
Hall Contracting
/ Categories: All, Sliplining

Charlotte Douglas International Airport Reline

PROJECT

Installed 2,300’ of 78” Aluminum Structural Plate in 96” CMP

Installed 1,000’ of 84” Aluminum Liner Plate in 90” RCP

Grouted annulus of all liner with 1,000 psi cellular grout, pumping through 2” high pressure hoses as far as 2,500’

 

LOCATION

Charlotte, NC

Previous Project Salem Lake Dam Next Project Ash Outfall Slipline
Print
58

Theme picker

Login